Additional project improvements include overhead sign structure installation, Intelligent Transportation System (ITS) and Express Lane markers, new signalization, lighting, signing and pavement markings, and ramp signalization at five interchanges from Glades Road to Linton Boulevard. The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). Access to the Express Lanes will be provided via two designated ingress and egress locations-between Glades Road and Spanish River Boulevard and between Yamato Road and Linton Boulevard. The number of General Use lanes will remain the same. ![]() ![]() One lane will be added, and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction. I-95 from south of Glades Road to south of Linton Boulevard and SR 808/Glades Road from NW 22nd Way to West University Drive in the Cities of Boca Raton and Delray Beach (95 Express Phase 3B-2)ĭescription: 95 Express Lanes Phase 3B-2 will extend the existing Express Lanes north from just south of Glades Road to just south of Linton Boulevard in Palm Beach County. We note that not everything is in an obvious order - we suggest skimming through for roads and highways that you frequent. ![]() Here’s a (very long) list of everything you can expect in the days ahead in Boca Raton, Delray Beach, Boynton Beach, and South Palm Beach County. The Florida Department of Transportation is busy at work. BOCA RATON, FL () (Copyright © 2022 MetroDesk Media, LLC) - Expect I-95 to close, expect surface roads to be resurfaced, expect light poles to be installed, and expect other traffic havoc as the week of gets underway.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |